in Maputo Mozambique sales price shop near me near me shop factory supplier Aluminum Electrolytic Capacitor Long Lead 47UF 25V manufacturer best Cost Custom Cheap wholesaler

  in Maputo Mozambique  sales   price   shop   near me   near me shop   factory   supplier Aluminum Electrolytic Capacitor Long Lead 47UF 25V manufacturer   best   Cost   Custom   Cheap   wholesaler

Complete use has been produced of all varieties of advanced techniques and technologies to achieve excelsior manufacturing. We also can design and style and make non-standard items to fulfill customers’ special requirements. Retaining in head that excellent services is the essential to cooperating with clients, we attempt to fulfill substantial high quality standards, supply aggressive costs and make sure prompt shipping and delivery.

one zero five degc Low Voltage EPT Frequency 47uf 25v Radial EPTT Electrolytic Capacitor

  • 47uf 25v lower voltage EPT radial EPT electrolytic capacitor
  • Load life of 3000 to 5000 hours at -40 ~ a hundred and five degc
  • Dimensions: six.three*11mm
  • EPTTedance:one.three Omega
  • Rated Ripple Recent:253mArms
  • Provide OEM/ODM services
  • Provide Free of charge Sample

47uf 25v Radial Alulminum Electrolytic Capacitor is our 3000 to 5000 several hours minimal voltage EPT collection. The radial alumium electrolytic capacitor is ideal for LED EPTT supply, charger, adpater, SEPTer and large resolution EPTT items,ect.

Genuine shot images

Specification:

Frequency Coefficient:

Freq.(Hz) 50 one hundred twenty 1k 10k 100k
.forty seven~47uf .70 .85 .90 .ninety five 1.
100~470uf .75 .ninety .ninety five .98 1.
one thousand~10000uf .eighty .95 .ninety seven .99 one.

Temperature Coefficient:

Temp( ordmC) 45 sixty five 85
Aspect one.six one.35 1.00

Dimensions(mm)

PhiD five six.three eight 10 13 16 eighteen
P two. 2.5 3.5 5. five. seven.5 seven.5
Phid .5 .5 .5 .six .6 .eight .8
beta 1. 2.
alpha .five

StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd Size(at 120Hz, one zero five degc):

Rated Ripple Present: mAmrs, one hundred and five ordmC, 100kHz.
Certifications:

Factory Present:

Our edge:

  • We have a seem raw materials cooperation system and cargo inspection system.
  • EPT with high balance, high temperature, modest dimension, tiny tolerance and so on.
  • Solution tolerances are strictly managed between -fifteen% to -10%.
  • We have the world’s most EPTd creation products, and increase the management approach.
  • We can give personalized layout of your wants and provide totally free sample for you.
  • Our products comply with the RoHS Directive and the manufacturing facility conforms to the ISO 9001 management technique.

FAQ:

Q1. Can i have some samples for capacitors?

A: Of course, welcome sample to check and check high quality,manufacturing facility manufacturer samples are cost-free.

Q2. What about the guide time?

A: The sample demands 3-5days, the mass items demands 2 months for orEPTTquantity.

Q3. How do you ship the merchandise and how EPTT does it consider to get there?

A: We typically ship by DHL,UPS,FEDEX or TNT, it usually requires 3-five daEPTTto get there.Airline and sea transport also optional.

This autumn. Is it Okay to print my symbol on capacitor?

A: Sure,pls notify us formally before our generation and verify the layout firstly primarily based on our sample

Q5. Do you offer assure for the merchandise?

A: Sure,we offer you 2-3years guarantee to our goods.

Q6. How to offer with the faulty?

A: If the product you acquire from manufacturing facility beacuse of high quality issues, you can return them to us for substitution or refund. And any products returned must be in their authentic issue to qualify for a refund or replacement.

If you have any intriguing and problems, remember to truly feel totally free to speak to us!

  in Maputo Mozambique  sales   price   shop   near me   near me shop   factory   supplier Aluminum Electrolytic Capacitor Long Lead 47UF 25V manufacturer   best   Cost   Custom   Cheap   wholesaler

Tags:

MH couplings

As one of leading mh couplings manufacturers, suppliers and exporters of products, We offer mh couplings and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of mh couplings

Recent Posts